Skip to content

Token-conservation fleet re-enable runbook (G3)

Date: 2026-07-04. Owner: platform. Gate: review gap G3.

The agent fleet was scaled to 0 to stop token burn. P0 tiering + adjacents, the G1/G2/G12 durable measurement, and the G7/G15/G17 hardening are all deployed. This runbook brings the fleet back staged, not all-at-once (the review's G3 warning), establishing a $/day baseline we do not yet have before widening.

Levers

Lever Where Effect
Master on/off kubectl scale deploy/tatara-operator -n tatara --replicas=N operator controller up/down; currently 0 (live-scaled, not in git)
Operator replicas (git) values/tatara-operator/default.yaml replicaCount (the {env}.yaml, highest-precedence layer - NOT common.yaml) a helmfile apply reconciles the operator Deployment to this (3). Immaterial to Claude burn (controllers do not call Claude; leaderElection runs 1 active); leave at 3 and pause via the live scale above
Per-project pause values/project-<p>/common.yaml project.spec.maxConcurrentTasks (5) agents run at once per project; 0 FULLY pauses the project (operator 2822968+ gates QueuedEvent admission on 0). Before 2822968, 0 floored to 3 and lifecycle/scan/triage tasks leaked through the per-repo seq-lane - the G3-blocking pathology. Unpause (0->N) resumes on the next scan-cron enqueue, not instantly
Brainstorm ...cron.brainstorm.enabled (true) + schedule (0 * * * *) the largest idle Opus spend (G10); off in Stage 1
Scan cadence ...cron.issueScan.schedule (0 */4 * * *), mrScan (0 */2 * * *) already stretched

Config changes go through a tatara-helmfile MR + GitOps apply. The master scale is a live kubectl scale (matches the current paused state).

Instruments (now durable + accurate)

  • $-cost by kind/repo: operator_task_tokens_total{model,type} x per-model price (Grafana task-delivery dashboard). Sonnet-priced kinds (triageIssue/review) should read cheaper than Opus kinds - the tiering A/B.
  • Cache-hit-ratio by kind (functional now that cache_read/input are separate).
  • Churn: operator_task_terminal_tokens_total{outcome} -> $/delivered vs $/churned (issueLifecycle-scoped; single-shot churn not yet captured - G4/G8).
  • Runaway alert: re-baselined to the model-aware $ rate.

Caveat: series populate only once tasks run. Empty panels at Stage 0 are expected; they fill during Stage 1.

Prerequisites / caveats before re-enabling

  • G9 (safety): if semver push-CD auto-merge is active, agent review is not a required check and mrScan is stretched to 2h - a bot PR could merge+deploy before a review pod spawns, reviewed by the downgraded Sonnet model when it does. Before relying on Sonnet review in a push-CD window, make agent review a required check OR hold the review downgrade. If push-CD is NOT live, N/A.
  • G4 (blind spot): review find-rate / implement CI-pass-rate / proposal accept-rate are not yet instrumented, so the Sonnet-review downgrade quality is watched manually via PR CI outcomes during Stage 1, not a metric.
  • Pause lever (fixed in operator 2822968): the first Stage-1 attempt found maxConcurrentTasks=0 did NOT hold a project - QueueCapacity() floored to 3 at 0, so issueLifecycle/scan/triage tasks kept leaking through the per-repo QueuedEvent seq-lane and "hold infrastructure at 0" silently burned ~63% of the window. Fixed by gating admit() on maxConcurrentTasks==0. Stage 1 now genuinely observes tatara alone with infrastructure held.

Stage 0 - verify paused baseline

kubectl get deploy tatara-operator -n tatara -o custom-columns=IMAGE:'.spec.template.spec.containers[0].image',DESIRED:.spec.replicas
# expect: tatara-operator:2822968  0  (pre-Stage-1 paused; 2822968 carries the pause fix + G8)
Confirm the Grafana token-conservation dashboards load (empty is fine).

Stage 1 - conservative single-project observation

Goal: establish the $/day baseline + confirm tiering and the durable metrics behave on real turns, at minimal blast radius.

Config (one tatara-helmfile MR, then apply): - Pin operator + both tatara-project releases to the new operator SHA (helmfile.yaml.gotmpl x3 + values/tatara-operator/common.yaml image.tag). - values/project-tatara/common.yaml: project.spec.maxConcurrentTasks: 2; ...cron.brainstorm.enabled: false. - values/project-infrastructure/common.yaml: project.spec.maxConcurrentTasks: 0 (held silent + validates the full-pause fix live).

replicaCount stays 3 (operator pods are not the Claude spend; leaderElection runs 1 active regardless). The apply reconciles the operator up on the new image; if it lands with the operator still live-scaled to 0, kubectl scale deploy/tatara-operator -n tatara --replicas=3.

Observe for a window (>= a full issueScan/mrScan cycle, ideally ~1 day): - Tiering works: a spawned review or triageIssue pod has MODEL=claude-sonnet-5; an implement/incident pod has claude-opus-4-8 (kubectl get pod <p> -o jsonpath env), and the $ panel shows the Sonnet-priced kinds cheaper. - Metrics populate: operator_task_tokens_total shows all four type values with a real model label; cache-hit-ratio is non-zero; a completed lifecycle task adds to operator_task_terminal_tokens_total{outcome}. - Health: no BootCrashLoop, no refusal/error flood in operator logs, no runaway alert. - Record the baseline: $/hour and $/day at maxConcurrentTasks=2, per kind.

Success -> proceed to Stage 2 and set thresholds from this baseline.

Stage 1 - first run results (2026-07-04, operator 2822968)

Ran ~14:48-14:55 UTC (~7 min, early snapshot), then operator re-scaled to 0.

  • Pause fix PASS (live): infrastructure (maxCT=0) created zero new Tasks / pods / tokens; tatara (maxCT=2) admitted 6 tasks at the same startup reconcile. The hold is proven by outcome + the project asymmetry - the skip is NOT emitted as a metric/log at INFO (infra queue was empty so admit() was never reached). Follow-up: add operator_task_admission_skipped_total{project,reason="paused"} so the pause is provable in metrics, not inferred.
  • Baseline ~\(0.70/hr -> ~\)16-17/day FLOOR at this config: near-all issueLifecycle/opus, 99.99% cache-hit. This is the floor (brainstorm off, infra held, no implement/review ran); steady state is higher.
  • Tiering: opus side confirmed (issueLifecycle/incident -> claude-opus-4-8); the Sonnet side (review/triageIssue) did NOT organically run - coded + envtest- proven but unexercised live. Watch for it at Stage 2.
  • Durable metrics: model + 4 cache types live; cache-hit-ratio works; operator_task_terminal_tokens_total had only outcome="abandoned" (the reaped stragglers) - delivered/churned populate once a task ships/churns a PR.
  • Operator health / runaway alert: 3/3, 0 restarts; alert normal (~2500x under threshold); coverage-gap meta-alert healthy now the model/cache series exist.
  • maxTaskTokens IS active (the measurement subagent's "inert" finding was a misread, corrected here): the maxTaskTokens=3000000 per-Task cumulative-output backstop enforces in task_controller.go (:1016/:1125; a zero value disables it, 3M is set) and is NOT gated by any flag. The subagent conflated it with the SEPARATE, richer tokenBudgetEnabled per-window budget feature (proactive/ emergency percent, reset windows, claudeSubscription mode) - that one is TOKEN_BUDGET_ENABLED="false", off by design. So the runbook's maxTaskTokens assumption HOLDS. Turning ON the per-window tokenBudget is a G6 design decision (budget in $/input-aware, per issue-lineage), not a safety blocker.
  • Minor: tool surface probe unhealthy (tatara-chat backend unreachable from the operator) every reconcile - agents still run; worth a look.

Stage 2 - widen stepwise (data-driven)

Set abort thresholds from Stage 1 first, e.g.: \(/hr > 3x the Stage-1 per-lane rate scaled to the new concurrency; refusal-rate > a few %; any BootCrashLoop; churned:\) share climbing. Each step is one helmfile MR + apply, observed before the next:

  • 2a: project-tatara maxConcurrentTasks 2 -> 5; replicaCount 1 -> 3. Watch throughput + $/day vs threshold.
  • 2b: project-tatara cron.brainstorm.enabled true (the biggest idle Opus spend - watch idle-cycle cost; if a no-op cycle still pays the full cold prefix, that is G10, note it).
  • 2c: project-infrastructure maxConcurrentTasks 0 -> 5.
  • Final: remove the temporary replicaCount override (back to the git default 3); steady state = both projects, brainstorm on, full concurrency.

Abort (any stage)

Immediate: kubectl scale deploy/tatara-operator -n tatara --replicas=0 (stops new spawns; in-flight agent pods drain/fail their next callback). Then revert the last helmfile values change (MR) so git matches. Diagnose from the $-by-kind + churn panels + operator logs before retrying the step.

Done criteria

Fleet steady at both projects / brainstorm on / full concurrency, $/day within the accepted budget, tiering confirmed cheaper for Sonnet kinds vs the pre-P0 all-Opus-xhigh baseline, no runaway. Then the remaining refinement gaps (G4 quality proxies, G5 self-tuning revert, G6 $-budget, G8 healthCheck tier, G10 brainstorm idle skip, G11 prefix slimming, G13 handoff, G14 subagent spike, G16 cd-race) are prioritized against the real telemetry this re-enable produces.